Editing
Kepler R&D Credit Study 2025
## Scope Federal R&D credit study for [[Kepler Machine & Tool]]'s 2025 tax year, covering qualified research expenses across their precision machining operation (~$8.2M revenue). Companion piece to the §174 capitalization work — see [[Memo Section 174 Capitalization]]. [[Priya Sharma]] leads; Diane reviews before the credit lands on the 1120-S. ## Objective Identify and document QREs under the four-part test, compute the credit (regular vs. ASC), and build project-level documentation that survives exam. Kepler is considering an entity sale in 3–5 years, so the file needs to be diligence-ready, not just filing-ready. ## Timeline - **2/10/2026** — Kickoff call with Kepler's controller; engagement letter via SafeSend - **3/4/2026** — PBC list out through Liscio per [[SOP PBC Request Process]]; payroll-by-project data, GL detail, ECN logs requested - **4/28/2026** — Extension filed for the 1120-S (on the [[2025 Extension Season]] board) - **5/19–5/21/2026** — On-site fieldwork: interviews with the two lead engineers and shop foreman; walked the 5-axis cell - **6/30/2026** — QRE quantification complete: ~$210K total QREs (wages $164K, supplies $31K, contract research $15K at 65%) - **7/8/2026** — Credit computed: **~$18.7K federal** under ASC method (regular method came in lower — no reliable base-period data) - **Upcoming: 8/15/2026** — Wrap-up target: final project write-ups, credit workpapers to Diane for review, Form 6765 draft to UltraTax ## Status as of 7/13/2026 Fieldwork done. Now documenting the four qualifying projects: (1) titanium bracket fixturing redesign, (2) thin-wall aluminum tolerance process, (3) coolant delivery experimentation on the Mazak, (4) CMM inspection automation scripts. Projects 1 and 2 are written; 3 and 4 in draft. The shop's ECN log is the documentation backbone — much better than [[Copper Kettle Brewing]]'s situation ([[Memo R&D Credit Declined Copper Kettle]] is the contrast case Priya cites in training). ## Budget vs. actual Budgeted 60 hours; ~54 in through 7/11. Write-ups should land us right at budget if the client turns the engineer review comments quickly. Fee is inside Kepler's $38K annual arrangement. ## Open items / next steps - Priya: finish project 3 & 4 write-ups by 7/24 - Client: engineer sign-off on technical narratives by 8/1 - Confirm §174 amortization schedule ties to the QRE population (no double-count, no orphaned costs) - Diane review week of 8/10; wrap 8/15 - Flag for 2026 planning: capture time contemporaneously — [[Staff Training Sec 174 2026-05]] covered the tracking template
Save note
Cancel
Plain markdown — link other notes with [[Note Title]].