Engagement

Kepler R&D Credit Study 2025

rd-creditsection-174manufacturingtax-credit

Scope

Federal R&D credit study for Kepler Machine & Tool's 2025 tax year, covering qualified research expenses across their precision machining operation (~$8.2M revenue). Companion piece to the §174 capitalization work — see Memo Section 174 Capitalization. Priya Sharma leads; Diane reviews before the credit lands on the 1120-S.

Objective

Identify and document QREs under the four-part test, compute the credit (regular vs. ASC), and build project-level documentation that survives exam. Kepler is considering an entity sale in 3–5 years, so the file needs to be diligence-ready, not just filing-ready.

Timeline

  • 2/10/2026 — Kickoff call with Kepler's controller; engagement letter via SafeSend
  • 3/4/2026 — PBC list out through Liscio per SOP PBC Request Process; payroll-by-project data, GL detail, ECN logs requested
  • 4/28/2026 — Extension filed for the 1120-S (on the 2025 Extension Season board)
  • 5/19–5/21/2026 — On-site fieldwork: interviews with the two lead engineers and shop foreman; walked the 5-axis cell
  • 6/30/2026 — QRE quantification complete: ~$210K total QREs (wages $164K, supplies $31K, contract research $15K at 65%)
  • 7/8/2026 — Credit computed: ~$18.7K federal under ASC method (regular method came in lower — no reliable base-period data)
  • Upcoming: 8/15/2026 — Wrap-up target: final project write-ups, credit workpapers to Diane for review, Form 6765 draft to UltraTax

Status as of 7/13/2026

Fieldwork done. Now documenting the four qualifying projects: (1) titanium bracket fixturing redesign, (2) thin-wall aluminum tolerance process, (3) coolant delivery experimentation on the Mazak, (4) CMM inspection automation scripts. Projects 1 and 2 are written; 3 and 4 in draft. The shop's ECN log is the documentation backbone — much better than Copper Kettle Brewing's situation (Memo R&D Credit Declined Copper Kettle is the contrast case Priya cites in training).

Budget vs. actual

Budgeted 60 hours; ~54 in through 7/11. Write-ups should land us right at budget if the client turns the engineer review comments quickly. Fee is inside Kepler's $38K annual arrangement.

Open items / next steps

  • Priya: finish project 3 & 4 write-ups by 7/24
  • Client: engineer sign-off on technical narratives by 8/1
  • Confirm §174 amortization schedule ties to the QRE population (no double-count, no orphaned costs)
  • Diane review week of 8/10; wrap 8/15
  • Flag for 2026 planning: capture time contemporaneously — Staff Training Sec 174 2026-05 covered the tracking template