SOP

SOP Review Engagement Checklist

a-and-areview-engagementssarsquality-control

Owner: Marcus Webb · SSARS review engagements; currently one recurring review — Cardinal Point Builders (see Cardinal Point FY2025 Review)

Purpose

Standardize review engagements so they meet SSARS requirements, satisfy the bank on time, and don't blow the budget. Cardinal Point's $2M Fifth Third LOC requires the reviewed FS annually by May 31 — miss that and the client is in technical default.

Procedure

  1. Acceptance & continuance. Confirm engagement letter is current (routed by Janet Rivera via SafeSend) and independence is documented for all five staff. The Tom Kowalski question — does his bookkeeping assistance impair independence? — comes up every year; document the answer (it doesn't, for a review, with management taking responsibility).
  2. Planning. Update the understanding of the industry and accounting basis; set materiality; tailor the AR-C 90 program.
  3. PBC list out via Liscio per SOP PBC Request Process — trial balance, bank recs, debt agreements, WIP schedule.
  4. Analytics. Ratio and trend analysis vs. prior year and expectations; document expectations before looking at actuals. Investigate variances beyond thresholds.
  5. Inquiries. Management inquiry checklist with the owner and bookkeeper; document responses and corroborating procedures where responses seem off.
  6. Construction WIP addendum (Cardinal Point): tie the WIP schedule to the GL, test percentage-of-completion math on the five largest jobs, look for profit fade job-over-job, check under/overbillings roll. The FY2025 review expanded the WIP note — keep that presentation going forward.
  7. Financial statements & disclosures. Draft FS with full disclosure checklist; second set of partner eyes (Diane Cole) on anything unusual.
  8. Representation letter. Dated same day as the review report; signed by owner and controller.
  9. Issuance. Marcus signs; Janet delivers via SafeSend, logs the date, and diaries next year's May 31 deadline.
  10. Archive within 60 days of report date.

Tools

Liscio, SafeSend, Excel workpapers (M365 A&A library), QBO read-only access.

Common failure points

  • WIP schedule arriving late or not tying to the GL — request it first, not last.
  • Analytics documented after the fact (expectations must precede results).
  • Rep letter date mismatch with report date.
  • Scope creep into audit-level procedures; it's a review — inquiry and analytics, not vouching, unless something looks wrong.